Bathrooms that feel like the calm at the end of the day.
Precision where it matters most — waterproofing, stone and light, detailed with care.
Our approach
How we think about it
Bathrooms reward craft and punish shortcuts. Behind the stone and tile is waterproofing, ventilation and slope that decide whether the room lasts a decade or leaks in a year. We detail both — the serenity you see and the engineering you don't — for primary suites and guest baths alike.
Scope
What's included
Wet-room and curbless showers, natural stone and large-format tile, custom vanities, proper waterproofing and ventilation, heated floors, and lighting for real life.
Investment & timeline
What a project like this runs
Typical Houston range
$25,000–$75,000+
Typical timeline
about 5–8 weeks on site
Mid-range Houston baths sit in the lower half of this range; primary-suite baths with custom tile and frameless glass reach the top. Because every home is different, Bager gives you one fixed investment after the design phase — the number you approve is the number we build to.
2026 Houston market data (Remodeling Cost vs. Value — Houston; USA Cabinet Store). Planning ranges, not a quote.
Recent work
Bathroom Remodeling projects
How we work
One studio, start to finish
We build the way you'd want a neighbor to build. One dedicated project manager, communication on a schedule you can plan your life around, and a client portal so you're never chasing an update. Your investment is fixed before we break ground and your workmanship is warrantied in writing — Texas licensed and insured. We run a clean, respectful site and work around your life, not through it. You don't manage us; you live your life. That's the point.
Planning the budget? Synchrony offers deferred-interest plans of 12, 18 and 24 months for projects from a single bathroom to a whole home. See how financing works.
Questions
Answered plainly
- What does a bathroom remodel typically cost in Houston?
- Mid-range Houston baths run around $25,000–$50,000; a primary suite with custom tile and frameless glass can reach $75,000 or more (2026 Houston market data). Bager gives you one fixed investment after design — the number you approve is the number we build to.
- How long does a bathroom remodel take?
- A full bathroom usually takes about 5–8 weeks on site. Waterproofing and tile set the pace — we never rush the layers that protect the room long-term.
- Do I need permits for a bathroom remodel?
- Any plumbing, electrical or layout change requires City of Houston permits. Bager handles the permitting and inspections as part of the work.
- Why do bathrooms cost more per square foot than other rooms?
- A bath packs plumbing, waterproofing, tile, glass and ventilation into a small footprint, so the fixed costs are spread over few square feet. The value is in the parts you don't see — done right, they last decades.
- Can you convert a tub to a walk-in shower?
- Yes — tub-to-shower conversions are one of the most common Houston requests. We resolve the drain, waterproofing and glass in design so the result is both beautiful and sound.
- Is the work warrantied?
- Yes. You close with a documented punch list, care guidance and a written workmanship warranty.

