Kitchens designed as the center of the home.
The room you live in most, planned as carefully as it deserves — on one fixed investment.
Our approach
How we think about it
A kitchen is the hardest room to get right because it has to work as hard as it looks. We design layout, cabinetry, stone, appliances and light as a single composition — resolved on paper before demolition — so the finished room feels inevitable, not assembled. Timeless over trendy.
Scope
What's included
Custom and semi-custom cabinetry, natural stone and quartz, layout and wall reconfiguration, lighting design, appliance integration, and studio-guided finish selection.
Investment & timeline
What a project like this runs
Typical Houston range
$40,000–$120,000+
Typical timeline
about 8–12 weeks on site
A full kitchen in Houston generally lands in this range depending on size, cabinetry and finishes; fully custom, luxury kitchens run higher. Because every home is different, Bager gives you one fixed investment after the design phase — the number you approve is the number we build to.
2026 Houston market data (Block Renovation permit data; USA Cabinet Store). Planning ranges, not a quote.
Recent work
Kitchen Remodeling projects
How we work
One studio, start to finish
We build the way you'd want a neighbor to build. One dedicated project manager, communication on a schedule you can plan your life around, and a client portal so you're never chasing an update. Your investment is fixed before we break ground and your workmanship is warrantied in writing — Texas licensed and insured. We run a clean, respectful site and work around your life, not through it. You don't manage us; you live your life. That's the point.
Planning the budget? Synchrony offers deferred-interest plans of 12, 18 and 24 months for projects from a single bathroom to a whole home. See how financing works.
Questions
Answered plainly
- What does a kitchen remodel typically cost in Houston?
- A full kitchen in Houston generally runs $40,000–$120,000 or more, depending on size, cabinetry and finishes (2026 Houston market data). Bager gives you one fixed investment after the design phase — the number you approve is the number we build to.
- How long does a kitchen remodel take?
- Most full kitchens take about 8–12 weeks on site once design and selections are resolved. You get a schedule before demolition and an update on a set cadence throughout.
- Do I need permits for a kitchen remodel in Houston?
- Electrical, plumbing and layout changes require City of Houston permits. Bager pulls and manages them as part of the project, so it never falls on you.
- Can we live in the house during the remodel?
- Usually yes. The kitchen is out of use, so we help you set up a temporary one and keep the rest of the home clean and livable while we work.
- What is included in the fixed investment?
- Design, selections, labor, materials and the agreed allowances are all in one written proposal. Scope and allowances are resolved on paper before we start, so there are no surprise line items.
- Is the work warrantied?
- Yes. Every project closes with a documented punch list, care guidance and a written workmanship warranty.

